Precision Rigging and Logistics Pty Ltd
  • Home
  • About
  • Contact
  • Services
  • Projects

111 George Street

12/9/2016

 
​Precision Rigging and Logistics completed what was known as the "impossible job"  Precision Rigging supplied the full logistics package to remove and replace a water cooled chiller system. The weights of the largest components were 3.5 tonne and were hoisted up the tower with a building crane and a series of winches to secure the components.

Comments are closed.
Contact 0447 309 235 | E [email protected]
M PO Box 4323 Springfield 4300 
Copyright © 2023 Precision Rigging and Logistics | All Rights Reserved | ABN: 91 608 824 157
  • Home
  • About
  • Contact
  • Services
  • Projects