Brisbane Convention and Exhibition Centre

2/7/2016

 
Chiller removal and replacement In Brisbane. 
We were engaged to supply the full package to remove and replace a 7tonne chiller.

Caboolture private hospital

16/6/2016

 
​Precision Rigging and Logistics completed a Chiller changer over at the Caboolture private hospital. The redundant chiller was broken into components for relocation due to the size restrictions. Superior crane hire assisted our onsite crew to remove the redundant components and land the new chiller in preparation for relocation. Check out some of the photos to see the how our crew relocated the new chiller into position with minimal room between operating services.

Allamanda Private Hospital, Gold Coast

9/4/2016

 
​Two senior Riggers from Precision Rigging and Logistics assisted COPE- sensitive freight to remove and relocate a 4.7 tonne MRI unit from Allamanda private Hospital, Gold Coast.
The 2 man crew where in charge of the winching and horizontal movement down a steep 20m ramp and outside for loading by a 20 tonne franna crane.

Grey Street, South Brisbane

9/4/2016

 
​Precision Rigging and Logistics, alongside Superior crane Hire completed a more than unusual crane lift. This was due to the nature of the set up and time restrictions by closing Grey Street South Brisbane between the hours of 10am-2pm. Precision Rigging supplied the full logistics package inclusive of, full traffic management, transport logistics and the required crane for the removal and installation of a 5.7 ton chiller. Grey street is an incredibly busy street that required much attention to traffic management and exclusion zones for the safety of the public. This is another great example why Precision Rigging and logistics can safely complete any task regardless of the scenario.

Southpoint B-Grey Street Southbank (Final)

1/4/2016

 
​Precision Rigging and Logistics completed the remaining plant equipment at Southpoint B-Grey Street.
Equipment relocation and final positioning consisted of 6 AHU's that were a difficult height of 4.7m with combined weight of 4 tonne, custom pump and heat exchange skids with each of them being between 4-7 tonne and uplift of custom ducting frames weighing over 3 tonnes.

Hotel Jen- Chiller Upgrade

19/3/2016

 
​Precision rigging and logistics commenced an ongoing project at the Jen Hotel Brisbane. First stage was to take a 5.5 tonne Air-conditioning Chiller unit and relocate it into the plant room via a series of service lifts and soft hatches through floors.

​Southpoint B-Grey Street Southbank

12/3/2016

 
Precision Rigging and Logistics supplied a crew of rigging and relocation's specialist to take delivery and final position custom frames. The complete weight of combined frames exceeded 14 tonne with unusual height and length dimensions. ​
Forward>>
Contact 0447 309 235 | E [email protected]
M PO Box 4323 Springfield 4300 
Copyright © 2023 Precision Rigging and Logistics | All Rights Reserved | ABN: 91 608 824 157
  • Home
  • About
  • Contact
  • Services
  • Projects